The 5-Second Trick For CAD

Appropriate me if Iam wrong, FFL refers to the level at the highest surface of flooring end. This is where many of the building element end amounts are referenced from. SFL refers back to the degree at the best area of the floor screeding or concrete topping. Although SSL refers to the amount at the top surface area from the structural slab. Des

read more